The village hall committee is back in business after its August break from meetings and there’s plenty of work on the horizon, from path extensions to new planting, to a heating system overhaul and a zip wire!
First, by the time you read this, extensions should have been made to the path around the playing fields. We’re adding path access by the playground and from the hall itself to ensure that people can get onto the path without having to walk on the grass – useful for accessibility and those muddy days.
We’ve started investigating costs and implications for installing a zip wire to add to the fun activities and in lieu of a pump track, which is now fully on the back burner. This would be most likely placed near the earth mound from our path excavations.
We’re also looking into how to eliminate our fossil fuel use and improve the hall’s energy resilience through the installation of an air source heat pump, solar panels, and battery storage. We’re hoping to have the facilities surveyed soon to see what’s possible.
And, now that our original tree and flower planting looks to have largely survived the year’s unprecedented heat, we’re looking at what can be done next to add to the diversity of flora on the playing fields for the benefit of humans and other animals.
As ever, if you’re interested in any of these activities and in helping us in any of our work, please reach out to me at chair@crudwellvillagehall.org.
Phil Buxton, chair, Crudwell Village Hall Committee.
